Veldhuizen Trucks - new compressed air piping network

Veldhuizen Trucks - new compressed air piping network

The Veldhuizen Trucks site in Zwolle has expanded its workshop and relocated much of its activities to a newly built, adjacent truck and trailer workshop. In the previous situation, the compressor was located in a damp basement, and compressed air was distributed through a network of hoses and reels. For the new setup, a more efficient solution was required. After an on-site visit from one of our compressed air specialists, a proposal was made for the installation of a new air piping network.

More information: www.veldhuizentrucks.nl

veldhuzien-trucks-logo-1600-v1.png

Complete Network in the Basement and Service Pits

A special feature of this project is that almost the entire piping network is located in the basement and service pits. On the ground floor, nearly all that is visible are the reels, which are fed from the basement through hoses connected to lockable take-off points in the piping network.

The piping system, nearly 200 metres in length, consists of a Ø40 ring main with secondary lines of Ø32 and Ø25. This provides sufficient capacity for users, who generally operate large impact wrenches, to carry out their work without interruption. In the service pits, Ø25 piping with AluSic wall plates was installed in-line. Naturally, this customer also opted for high-quality, safe Prevost ESI couplings.

veldhuizen2.jpg

20180214_110142.jpg

Project Realisation Together with Ravam Tools

This project was completed within four weeks, from calculation and quotation to final delivery. Thanks to Q Plus’s extensive stock, your project can also be delivered quickly and efficiently.

For efficient and timely execution, Q Plus worked with AluSic dealer and installer Ravam Tools B.V., who handled the delivery and installation of the complete piping network.

More information: www.ravamtools.nl